Abstract

Daqing peripheral oilfield in the shallow layer is low abundance and low permeability thin interbed reservoir, which has the characteristics of multiple layers, low permeability, and small interlayer thickness. The reservoir development is not balanced. According to this characteristic, in order to be effective and economically develop this kind of reservoir, the research adopts stepped horizontal well development technology. And with the application of dynamics and kinematics theory, establishing a three-dimensional track ladder design of horizontal wells, horizontal section of casing string lifting limit and the mathematics model to calculate stress. The establishment of the analysis of drilling technology can accurately judge the position of bit and reservoir development, and timely adjust track. Key words: Thin layer; Stepped horizontal well; Optimization design; Trajectory control of; Cementing quality

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.