Abstract

In 1994 the United States of America and the Democratic People’s Republic of Korea (DPRK) signed the Agreed Framework in which the DPRK committed to shut down their graphite-moderated reactors and related facilities and to remain a party to the Treaty on the Non-Proliferation of Nuclear Weapons. In return the U.S. agreed, among other things, to deliver two light water reactor (LWR) units to the DPRK which should meet international safety standards. For the implementation of this Agreed Framework, the Korean Peninsula Energy Development Organization (KEDO) was founded. KEDO decided to build two units of the Korea Standard Nuclear Power Plant (KSNP) model, which is a proven design of U.S. origin. This paper describes the status of this project (the LWR project) and the unique challenges that KEDO must overcome to implement the construction and commissioning of this project and have the DPRK ready for plant takeover.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.