Abstract

A critical component of Milwaukee’s $ 2.8 billion Water Pollution Abatement Program is a 31.2-km inline storage system comprising three Deep Tunnel sections that were bored between 1984 and 1993 at a depth of 80–100 m within Silurian-aged Niagara dolostone. Construction of these Deep Tunnels proved more difficult and expensive than estimated because the karstic nature of the dolostone, particularly its hydrology, had not been fully appreciated. Rock collapse, subsidence and groundwater intrusion necessitated remedial grouting and lining of about 45% of the tunnels, costing some $ 50 million above estimates and delaying completion by 9 months. Tunnel performance since completion continues to be controversial.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.