Abstract

Process of monitoring a parameter of condition in heat recovery steam generator (HRSG) system is particularly important. In this paper a new supplemental method for condition monitoring of water-tube boiler (superheater and reheater) through iterative technique and finite element simulation is proposed. The method is utilizing the empirical formula for estimating scale thickness developed on the inner surface of the tube over period of time. An iterative procedure is carried out to determine the average temperature in the tube as scale thickness on the inner surface increases. Different heat transfer parameters governing the problem are used and evaluated. The results obtained by using the proposed method are verified with the actual data of the available reports. Examples on failure analysis of the boiler tube utilizing the proposed technique are presented. The method may provide better estimation, provided that all the heat transfer parameters are well specified by the HRSG operators.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.