Abstract

General Atomics (GA) was awarded the first phase of the ITER Central Solenoid (CS) Module Fabrication (CSMF) contract by US ITER in July 2011. The ITER CSMF is managed by the US ITER Project Office (USIPO) at Oak Ridge National Laboratory, under the sponsorship of the Department of Energy Office of Science. Goals of the base contract include definition and qualification of manufacturing processes and tooling necessary to fabricate seven CS modules (6 + 1 spare) that constitute the ITER CS. Qualification is completed at each manufacturing station with the production of a mockup coil using dummy conductor. A subsequent, second phase manufacturing effort produces the CS Modules which will be delivered to the ITER site in Cadarache, France during 2016-2018. GA is developing an integrated manufacturing process along with specialized tooling based on the USIPO requirements. An integrated management system utilizes proven risk management, configuration management, quality assurance, and earned value management tools to identify and manage program efforts. Regular interaction between the USIPO and GA teams review and address program issues. Formal Tooling Requirements Reviews (TRR), Preliminary Design Reviews (PDR), Final Design Reviews (FDR) and Manufacturing Readiness Reviews (MRR) for eleven (11) manufacturing stations are the key milestones in the tooling development phase of the program. Seven (7) CS Module deliveries are the primary milestones in the manufacturing phase of the program. The critical path for the tooling development phase is driven primarily by the Winding System design and fabrication, and the qualification of processes on a mockup of the CS Module. The manufacturing phase is driven by the delivery of the production conductor. GA has established a fabrication facility that combines 1,500 m <sup xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">2</sup> of offices with 6,000 m <sup xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">2</sup> of fabrication space. Extensive building modifications are complete with the first manufacturing tooling arriving in late 2013. The facility utilizes several cranes with up to 35 T capacity to handle and move delivered conductor and wound hex and quad pancakes during the winding, joint and lead fabrication, and stacking operations. Once the CS Module is stacked, it is moved between manufacturing stations on an air bearing moving tool on a high capacity floor for the nearly 200 tonnes CS module and tooling. The manufacturing process flow uses primarily one set of tools per station, except for the critical Winding and Turn Insulation Stations which require two sets of tools to meet delivery requirements and to minimize program schedule risk. Most tools are unique to the ITER CSMF and are designed and built by GA and tooling suppliers. GA is performing manufacturing development tasks to reduce program risks and to support the generation of process and tooling requirements. GA has placed contracts for the design and fabrication of time critical systems. Tauring S.p.A is designing and fabricating the Winding Station and Ridgway Machines LTD has been selected for the insulation wrapping heads used in the Turn Insulation Stations. The Reaction Heat Treatment Furnace contract has been issued to Seco Warwick.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.