Abstract

Public investment into risk reduction infrastructure plays an important role in facilitating adaptation to climate impacted hazards and natural disasters. In this paper, we provide an economic framework to incorporate investment timing and insurance market risk preferences when evaluating projects related to reducing climate impacted risks. The model is applied to a case study of bushfire risk management. We find that optimal timing of the investment may increase the net present value (NPV) of an adaptation project for various levels of risk aversion. Assuming risk neutrality, while the market is risk averse, is found to result in an unnecessary delay of the investment into risk reduction projects. The optimal waiting time is shorter when the insurance market is more risk averse or when a more serious scenario for climatic change is assumed. A higher investment cost or a higher discount rate will increase the optimal waiting time. We also find that a stochastic discount rate results in higher NPVs of the project than a discount rate that is assumed fixed at the long run average level.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.