Abstract

The grid integration of plug-in electric vehicles (PEVs) requires a comprehensive analysis and effective control strategies to prevent any violation of the electrical constraints of the power systems. When renewable energy sources (RESs) are available, they can be used to supply the energy demand of the PEVs. In this study, a photovoltaic (PV) power plant and IoT based remote control of PEV charging are proposed as a virtual power plant (VPP). Particularly, the concept for the use of LoRaWAN to remotely monitor and control the PEV charging loads is presented. Moreover, a hierarchical VPP control (VPPC) system based on the model predictive control (MPC) method is proposed for the optimal energy management (EM) of the VPP. The EM of the VPP is scheduled based on the predicted information initially and based on the optimal values for the EM and the intermittency of PV generation, the charging rate of the PEVs is modified during the real-time process. The results of the case studies show that the proposed VPPC can minimize the energy costs to the VPP and satisfy the energy balancing for the VPP entities while fulfilling the charging demand of the PEVs under system uncertainties.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.