Abstract

In this work we briefly present the study results of the issue of accounting and implementation of specific mathematical tooling for non-economic characteristics in evaluating of projects’ effectiveness. There is established classification of events in which using of one or another mathematical apparatus during solving the question of accounting for non-economic characteristics can be observed. It is proposed to study the classification of non-economic characteristics easily formalized and difficult to formalize (parameters) that are used when assessing the effectiveness of projects. There is explained and recommended a certain mathematical tooling for the process of accounting for non-economic characteristics in the assessment on the basis of classification under description.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.