Abstract

Summary This paper describes studies by Esso E&P U.K. that evaluate various completion strategies for new subsea wells in the Cormorant field, U.K. North Sea. These studies, which complement work done by the field operator (Shell U.K. E&P), include detailed reservoir description work to define oil-in-place (OIP) and permeability distribution and a waterflood simulation for a representative reservoir cross section. Wellbore, flowline, and pipeline hydraulics for the complex production/injection system are included to model well rates more accurately. The results provide general insight into the nature of displacement during waterflooding of a stratified section with a limited number of wells. They also provide specific guidance on (1) dual vs. single completions; (2) perforating, testing, and stimulation sequence; and (3) the benefits of partially perforating high-permeability sands.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.