Abstract

A reduction in the inventory replenishment lead-time allows reducing safety stock requirements and improving customer service. However, it might be accompanied by increased procurement costs because of premium charges imposed by suppliers, or higher transportation costs. This paper studies a single-stage variable lead-time inventory system with lead-time dependent procurement cost. Selection of the lead-time value represents finding the trade-off between benefits of lead-time reduction and increase in the procurement cost. A model for joint optimization of inventory and procurement costs is developed. Numerical studies are conducted to identify conditions under which lead-time reduction is favorable compared to procuring at the lowest cost.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.