Abstract

It is well known that Load Frequency Control (LFC) model plays a vital role in electric power system design and operation. In the literature, much research works has stated on the advantages and realization of DR (Demand Response), which has proved to be an important part of the future smart grid. In an interconnected power system, if a load demand changes randomly, both frequency and tie line power varies. LFC-DR model is tuned by standard controllers like PI, PD, PID controllers, as they have constant gains. Hence, they are incapable of acquiring desirable dynamic performance for an extensive variety of operating conditions and various load changes. This paper presents the idea of introducing a DR control loop in the traditional Multi area LFC model (called LFC -DR) using LQR- Fuzzy Logic Control. The effect of DR-CDL i.e. (Demand Response Communication Delay Latency) in the design is also considered and is linearized using Padé approximation. Simulation results shows that the addition of DR control loop with proposed controller guarantees stability of the overall closed-loop LFC-DR system which effectively improves the system dynamic performance and is superior over a classical controller at different operating scenarios.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.