Abstract
In this paper, we give a state review of modeling methodologies for four-dimensional computer-aided design (4D CAD) and three-dimensional (3D) animation of operations simulation. We then present our efforts of integrating 4D CAD and 3D animation of operations simulation to facilitate the construction planning of the main stadium for the Beijing 2008 Olympic Games (nicknamed the “Bird’s Nest”). We propose a “zoom” interface between 4D CAD and 3D animation of operations simulation to enable a natural synergy of two separate, but organically linked research streams. For concept proving and application demonstration, we seamlessly integrated two computer systems resulting from previous in-house research to plan and visualize the construction of the “Bird’s Nest” in close collaboration with the main contractor. The integrated construction planning methodology is found instrumental in visually and intuitively conveying the master project schedule and detailed operations plan for construction of the “Bird’s Nest”.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.