Abstract

This study aims to design a BIM integration model for steel building projects (BIM-DFE). It was developed in the following three phases: (i) theoretical phase, (ii) validation phase, and (iii) statistical analysis for the theoretical phase. A literature review was conducted to study the applications of BIM in steel building projects and to develop an integrated BIM process map for the construction lifecycle of steel buildings. Subsequently, in the validation phase, 32 participants were invited to complete a two-round Delphi questionnaire to validate the BIM-DFE proposal. The participants were classified according to their knowledge level (skilled or expert). Based on the literature review, a process map that integrates BIM in different phases of a steel building project was created. In the first round of the Delphi questionnaire for the validation phase, the various groups studied (skilled vs. expert) were in moderate agreement with the BIM-DFE proposal; however, after the second round, this agreement became better. Therefore, this study contributes to the current body of knowledge by providing a BIM integration model to improve the management of steel building projects as defined by critical stakeholders in the steel industry. In addition, a real-time case is presented to elucidate a part of the research contribution.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.