Abstract

This paper investigates the hot rolling production scheduling problem in the steel industry and proposes a new mixed integer programming model for this problem based on the monolithic modeling strategy that integrates batching and scheduling. Using this strategy, the new model can simultaneously schedule multiple turns and simultaneously determine the production timetable of these turns in a global optimal view. A long-term tabu search heuristic using frequency-based memory is developed to obtain near-optimal solutions for this problem. Three kinds of speed-up strategies are developed to accelerate the search procedure of the proposed tabu search. A practical scheduling system combining the proposed mathematical model and the tabu search heuristic has been developed and tested on instances collected from practical production data. The experimental results show that the proposed mathematical model and the tabu search heuristic outperform both the current manual scheduling method and the traditional serial method.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.