Abstract
Forecasting the actual cost to complete a project is a critical challenge of project management, particularly for data-driven decision making in contingency control, cash flow analysis, and timely project financing. This paper presents a Bayesian project cost forecasting model that adaptively integrates preproject cost risk assessment and actual performance data into a range of possible project costs at a chosen confidence level. The second moment Bayesian (SMB) model brings more realism into project cost forecasting by explicitly accounting for inherent variability of cost performance, correlation between aggregated past and future performance, and the fraction of project completed at the time of forecasting. Functionally, the SMB model fully encompasses, as restrictive cases, two most commonly used index-based cost forecasting techniques in earned value management. The SMB model provides computationally efficient algebraic formulas to conduct robust probabilistic forecasting without additional burden of data collection or sophisticated statistical analysis. Numerical examples and simulation experiments are presented to demonstrate the predictive efficacy and practical applicability of the SMB in real project environments.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.