Abstract

The objective of project task scheduling is to determine task start dates and durations to complete a project on time with the minimum cost of performing tasks plus overhead. By altering task start dates and durations, the daily labor-demand profile can be changed. The objective of personnel scheduling is to determine how many workers must be assigned to each feasible days-off tour to satisfy a given labor-demand profile with minimum labor cost. Integrating these two problems permits the simultaneous determination of start dates, durations, labor levels and required tours for a minimum-cost and on-time schedule. Both integer programming and heuristic solution procedures to solve the integrated problem are presented. In a series of 20 test problems, the heuristic procedure outperformed the traditional two-step scheduling procedure by reducing the cost of labor and overhead by 8.6%.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.