Abstract
In this paper we study the scheduling problem that considers both production and job delivery at the same time with machine availability considerations. There are two parallel machines, where one machine is not available during a time period. Only one vehicle is available to deliver jobs in a fixed transportation time to a distribution center. The vehicle can load at most c jobs as a delivery batch in one shipment due to the vehicle capacity constraint. The objective is to minimize the time by which all jobs are delivered. We consider both resumable and nonresumable cases. For each case, we propose an approximation algorithm with a worst case ratio of 3/2.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.