Abstract

This chapter deals with coordination of insulation levels for overhead lines. As overhead lines operate at different voltage levels and connected with other parts of power system network, knowledge of power frequency nominal voltage levels has been presented. Then lightning of other transient over voltages has been presented. Concept of basic insulation levels has been provided mentioning its necessity. Then insulation coordination factors have been mentioned. Coordination with respect to insulation level of apparatus has been presented. Coordination with arresters has been described. Insulation coordination between overhead lines and connected substations has been discussed. At the end of the chapter, some useful standards have been listed for further study.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.