Summary Summary. To reduce development costs at the Mokoko-Abana field, all production equipment was installed in deck units during fabrication and the equipment was precommissioned in,the contractors’ yards before loadout. The 5,000-ton [4500-Mg] central production facilities deck, however, exceeded lifting capabilities of available marine equipment, so a unique installation technique was developed that uses tidal changes and rapid barge ballasting to lower the completed deck onto a specially designed jacket.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.