Abstract
The remediation of cadmium-pyrene co-contaminated soil by electrokinetic (EK) and the influence factors were investigated in this study. The artificial contaminated soils were treated for 20 days in EK experimental setups without electrolyte solution reservoirs, to simulate in-situ remediation of unsaturated soil. The results indicated that polarity-reversing electric field had maintained soil pH in the range of 7.27–7.67. Cadmium (Cd) contaminant would aggregate near electrodes, and the average Cd concentration in these areas had reached 72.21 mg/kg (original 51.6 mg/kg), while the value in soil farthest away from electrodes was 33.58 mg/kg. The reasons for Cd aggregated were: the insoluble hydroxide formations attribute to the frequently alternation of acid-base environment, and the decrease of pH and water holding capacity in soil away from electrodes would promote the dissolved Cd movement by electro-osmosis flow. Although the applied electric field could promote the growth and activity of pyrene-degrading microorganisms (PDM), the soluble Cd would be the restriction factor, especially in soil near electrodes. However, the highest (56.38%) pyrene removal efficiency (PRE) was achieved near electrodes due to the synergistic effect of electric filed and PDM, and PRE was positively correlated with the PDM number in soil away from electrodes.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.