Abstract

The extension of the Nijmegen wastewater treatment plant for full nitrogen and phosphorus removal is enormously reduced by introducing an innovative energy interaction with an incineration plant. A reduction of the investment costs of 30-40% has been reached. Heating up a part of the primary sedimentation overflow leads to a constant process temperature of 20-25 degrees C and an advanced biological phosphorus and COD removal.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.