Abstract
This article presents a method of management of the initial spare parts supply. This generic problem is of particular interest in certain systems in which the difficulty of accessibility or the life cycle duration constitute risks tied to the possible depletion of the spare parts stock. In this paper we consider the spatial context. After having commented on the particularities of the management of the spare parts supply of a space station, we propose a method based on the minimization of the risk of postponement of a maintenance operation. Finally, an application to the Columbus laboratory of the International Space Station is presented.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.