Abstract

In the last decade, the photovoltaic (PV) solar plants have been spreading around the world with low cost and a construction record time. In this perspective, the challenges have been centered in the inverters, panels, and medium voltage cables design, in order to obtain the best efficiency; however, one of the main elements is the fuse for the strings, in the DC side. Several manufacturers have detected problems in the operating regime of fuses due to the recommendations of the IEC standard 61439-1, 61439-2, 60269-6, 60269-1, 60469; our findings are the influence of the derating factors, loading cycle of the fuse in PV solar plants caused by clouds and string-box size; it has influence in the fuse design; a traditional IEC calculation is not an adequate value for the DC fuse, with fuses melt until 30% of the total fleet per year, in a regular PV Solar plant, but with a new consideration of string-box size and derating factor in the fuse design; with this methodology, the failure rate could be reduced, suddenly, with a result of to 0.2% failures per year, with an improvement of 1.06% of the derating factor and size of the string-box, with the algorithm for future development and design according the best performance in the PV solar plant as a complementary procedure in the international standard with an accuracy of 99.99%.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.