Abstract

The Kursk TETs-1 heating and electric power plant is discussed as an illustration of preventing thermal contamination of its water supply (River Seim) by circulating water. An effective water supply system is taken to be one for which the overheating of the water at a monitoring site (near the outlet location) does not exceed an approved level for the water use conditions. The required cooling capacity of a spray pond for circulating and flow-through water supplies is determined.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.