Abstract

Results of thermal tests of the Pp-1000-255 boiler, K-310-240-4 steam turbine, and power generating unit No. 1 of the GRES-24 state regional electric power plant after installation of a GTE-110 gas turbine and operation in a combined cycle are reported, along with the results of preliminary guarantee tests of the gasturbine unit. The design and guarantee indicators of the thermal efficiency of the power generation unit and its individual components are compared with the actual values. Operating deficiencies of the equipment are pointed out.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.