Abstract

This article provides an analysis of the effect of adding hot-briquetted iron (HBI) on the main smelting production indices, DSP-150 lining working layer life, and refractory material consumption for servicing under PAO Tagmet electric steel smelting workshop conditions. Various schemes are considered for HBI charge fractions to a furnace and the optimum version is determined. Changes in slag composition are analyzed with use of HBI. Recommendations are proposed for furnace lining servicing under conditions of using HBI on the example of DSP-150 operated on a solid charge in order to improve its life. The economic saving effect of introducing the recommendations is demonstrated.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.