Abstract

The Dębieńsko plant in Czerwionka-Leszczyny, Poland, producing evaporated salt from the saline mine water, faces increasing operating costs due to its high energy consumption. To improve the performance of the plant, a two-pass nanofiltration with intermediate crystallization of gypsum was proposed as a pretreatment. Based on the results of pilot-scale research, it was found that the removal of most of the calcium, magnesium, and sulfate allows a substantial reduction in the concentration of these components in the concentrated brine, which is then directed to a sodium chloride crystallization evaporator. This makes it possible to increase salt yield from the current 58.8% to 76.1% and indirectly reduce energy consumption from 1350 kWh/t to 1068 kWh/t. At the same time, the volume of the highly saline post-crystallization lyes is decreased by 66%, and a new stream is obtained: a Mg-rich solution, which could be used for magnesium hydroxide recovery.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.