Abstract
The continuous quality improvement approach in peritoneal dialysis practice necessitates definition of the factors and the procedures that may possibly be contributing to the final success of peritoneal dialysis. The philosophy of continuous quality improvement uses the Plan, Do, Check, Act (PDCA) cycle. To improve the procedures used during peritoneal dialysis, the first step is to create a plan, then to carry out the plan, to check it, and after the collection of satisfactory information, to execute the chosen improvement action. Several studies have identified the most frequent causes of transfer from PD to HD as infection, catheter problems, inadequate dialysis, and psychosocial factors, among others. According to training guidelines from the International Society for Peritoneal Dialysis, seven points are of major importance to decrease infection risks: exit-site care, catheter placement, antibiotic prophylaxis for procedures, prevention of bowel-source peritonitis, prevention of fungal peritonitis, and connection methods. On the other hand, other factors such as hypoalbuminemia, depression, and obesity should also be taken into consideration for better technique survival in peritoneal dialysis patients.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Peritoneal Dialysis International: Journal of the International Society for Peritoneal Dialysis
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.