Abstract

Abstract The achievement of low cost and fast-track construction for new-build FPSO hulls are challenging problems. In order to solve these problems, the authors developed and reported unique modular design and multi-yard construction concept, “noah-FPSO Hull” [1][2][3]. Since then, the authors continued to improve its design and expanded its flexibility for harsh environment and customer’s requests. As a result, new standardized fore/aft modules and cargo tank module have been developed to expand the flexibility. This paper presents the design of the newly developed modules and the feasibility for harsh environment.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.