Abstract

We consider a single-machine due window assignment and scheduling problem with batch deliveries, where all jobs have a common due window, and the start time and size of the due window are decision variables. Finished jobs are delivered in batches with unlimited batch capacity. The objective is to determine the due window, a job sequence, and the delivery times, so as to minimize the total cost which comprises earliness of delivery, job holding, start time of due window, size of due window, number of delivery batches, and tardiness penalty. We consider three different variants of the problem corresponding to different measurements of tardiness penalty. We present polynomial-time solution procedures for these variants with significantly lower computational complexities than those of known algorithms in the literature.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.