Abstract

Abstract One hundred seventy-seven tracts in South Carolina were evaluated for compliance with site preparation Best Management Practices (BMPs). South Carolina Forestry Commission foresters evaluated compliance with BMPs in each of four categories of site preparation: (1) mechanical treatments, (2) herbicide applications, (3) prescribed burning, and (4) minor drainage. In addition, each site was evaluated for overall BMP compliance, which was based on the level of BMP compliance and evidence of off-site water quality impacts. Overall BMP compliance was 86.4%. Compliance was highest for mechanical (92.0%) and herbicide (88.3%) site preparation treatments and lowest for minor drainage (76.9%) and prescribed burning (70.4%). Eleven variables were analyzed to determine their influence on BMP compliance. Four variables were found to be significantly related to BMP compliance: (1)physiographic region, (2)proximity to streams, (3)percent slope, and (4) terrain type. The four significant variables described the increased risk involved in site preparing land that is in close proximity to streams. Noncompliance with BMPs was clearly focused on the Piedmont physiographic region where 22 of the 24 inadequate sites were located. South. J. Appl. For. 22(2):74-80.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.