Abstract

Some essential differences exist between a wind power generation system and a conventional generator. The impact on the transient stability of a power system must be explored if wind power, particularly large-scale wind power, is to be integrated into existing power systems. In a wind power system, one of the main issues in power system safety and operation is rotor angle stability. Rotor angle stability is determined by its critical clearing time (CCT).This study examines the grid connection of 1833MW of wind power capacity into the existing Taipower system and explores the impact of integrating large-scale wind power on a power system’s CCT. It was observed via simulation that the penetration of wind power in the system peaks at 12%. The simulation uses PSS/E power system analytical software to establish a 1626-bus power system for Taiwan and contains details of power grid component parameters and wind turbine models. We assume that a balanced three-phase short-circuit ground fault occurs on each 345kV bus. The CCT for each case is then acquired. Finally, this study compares and investigates the causes of differences in system CCT before and after integrating 1833MW of wind power into the Taipower system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.