Abstract

This study investigates the impact of including (or neglecting) the variable efficiency of hydrogen electrolyzers as a function of operating power in the modelling of green hydrogen produced from variable renewable energy sources. Results show that neglecting the variable electrolyzer efficiency, as is commonly done in studies of green hydrogen, leads to significant overestimation of hydrogen production in the range of 5–24%. The effects of the time resolution used in models are also investigated, as well as the impact of including the option for the electrolyzer to switch to stand-by mode instead of powering down and electrolyzer ramp rate constraints. Results indicate that these have a minor effect on overall hydrogen production, with the use of hour resolution data leading to overestimation in the range of 0.2–2%, relative to using 5-min data. This study used data from three solar farms and three wind in Australia, from which it is observed that wind farms produced 55% more hydrogen than the solar farms. The results in this study highlight the critical importance of including the variable efficiency of electrolyzers in the modelling of green hydrogen production. As this industry scales, continuing to neglect this effect would lead to the overestimation of hydrogen production by tens of megatonnes.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.