Abstract
Hong Yan He Nuclear Power Plant (HYH NPP) is on behalf of the first standard technology CPR1000 plants. And the digital technology has been introduced to the Advanced Control Room (ACR) called the computerized Human Machine Interface. The control means of ACR should be sufficiently reliable that it will never be triggered a complete loss or never be stopped for maintenance purposes, and should always support the demonstration of the safetyclassified path. Due to the loss part function of normal control and monitoring means which are named Main Control Means (MCM) in Main Control Room (MCR), the study analyzes the possible degraded operating configuration of different control means and focuses on the application.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: The Proceedings of the International Conference on Nuclear Engineering (ICONE)
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.