Abstract

The objective of this study is to develop and thoroughly evaluate several feasible hybrid trigeneration configurations based on a gas turbine combined cycle (GTCC) for generating electricity, freshwater, and cooling. Six hybrid configurations are developed by integrating different desalination and chiller systems to the GTCC. Desalination systems include multi effect distillation (MED) and reverse osmosis (RO) with pressure exchanger (PEX) and chiller systems include double effect and half effect water-lithium bromide absorption chillers (DEABC and HEABC) and a vapor compression chiller (VCC) with different working fluids. The specific goal is to identify the optimal hybridization scheme and parameters among different configurations. The economic results show that implementation of RO is more economical than a hybrid MED-RO system in which the power cycle’s condenser is replaced by a MED. Also, the use of DEABC is more economical than a HEABC and a VCC. The results demonstrate that configuration 1 in which GTCC with the wet cooling tower is integrated with DEABC and RO is the most economical configuration. For this system, the levelized costs of electricity, water, and cooling (LCOE, LCOW, LCOC) are $0.0648/kWh, $0.7219/m3 and $0.0402/ton-hr, respectively, of which LCOE and LCOC are not the lowest values among different configurations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.