Abstract

In this paper, we address the scheduling problem for a heavy industry company which provides ship engines for shipbuilding companies. Before being delivered to customers, ship engines are assembled, tested and disassembled on the test beds. Because of limited test bed facilities, it is impossible for the ship engine company to satisfy all customers’ orders. Therefore, they must select the orders that can be feasibly scheduled to maximise profit. An integer programming model is developed for order selection and test bed scheduling but it cannot handle large problems in a reasonable amount of time. Consequently, a hybrid genetic algorithm (GA) is suggested to solve the developed model. Several experiments have been carried out to demonstrate the performance of the proposed hybrid GA in scheduling test beds. The results show that the hybrid GA performs with an outstanding run-time and small errors in comparison with the integer programming model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.