Abstract
AbstractDespite an important role of subterranean rodents as ecosystem engineers, their belowground mobility is poorly documented. It is supposed that their underground burrow systems, once established, are relatively stable because of high‐energy costs of digging. We chose the silvery mole‐rat,Heliophobius argenteocinereus(Bathyergidae, Rodentia) from mesic Afrotropics as a representative of solitary subterranean rodents to investigate how, and how fast these rodents process their established burrow systems. We combined radio‐tracking of individual animals with subsequent mapping of their burrow systems, and we developed a new method for assessing the rate of burrowing. Mole‐rats continuously rebuilt their burrow systems; they excavated approx. 0.7 m of new tunnels per day and backfilled on average 64% of all tunnels. On average, every 32 d they established a new nest. They often completely backfilled newly excavated peripheral burrows, while other parts of their burrow systems were more permanent. Their home‐ranges were dynamic and continuously shifted in space. Burrow system processing continued even in the advanced dry season, when soil is difficult to work.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.