Abstract

Partial discharge (PD) online monitoring is considered as one of the most effective means to prevent sudden accidents of hydro-generator. In this paper, a set of high reliable hydro-generator PD online monitoring system was developed, which made use of PDA technique to obtain PD signal and adopted PD integrated monitoring method to make sure the credibility of PD analysis results. Three aspects of investigation were carried out to ensure the high reliability of the system: (a) to effectively eliminate the on-site interferences and ensure the reliability of PD pulses acquisition, the PDA method is adopted and pulse time-delay technique is studied;(b) to overcome the isolation properties of the traditional PD online monitoring and ensure the high reliability of PD analysis results, on the base of the PD influence factors analysis, the PD integrated monitoring and association analysis model was set up, (c) to verify the reliability of the installation of PD sensors, the security performance of PD sensor body during hydro-generator in short circuit fault was studied. At present, the system has been applied to several hydro-generators in a huge-size hydropower plant.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.