Abstract
Hemolysis in medical devices and implants has been a primary concern over the past fifty years. Turbulent flow in particular can cause cell trauma and hemolysis in such devices. In this work, the effects of turbulence on red blood cell (RBC) damage are examined by simulating the flow field through a centrifugal blood pump that has been identified as a case study through the critical path initiative of the US Food and Drug Administration (FDA). In this study, a new model was employed to predict hemolysis in the turbulent flow environment in the pump selected for the FDA critical path initiative. The operating conditions for a centrifugal blood pump were specified by the FDA for rotational speeds of 2500 and 3500rpm. The model is based on the analysis of the smaller eddies within the turbulent flow field, since it is assumed that turbulent flow eddies with sizes comparable to the dimensions of the RBCs lead to cell trauma. The Kolmogorov length scale of the velocity field is used to identify such small eddies. Using model parameters obtained in prior work through comparisons to capillary and jet flow, it is found that hemolysis for the 2500-rpm pump was predicted well, while hemolysis for the 3500-rpm pump was overpredicted. Results indicate refinement of the model and empirical constants with better experimental data is needed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.