Abstract
AbstractTo use control charts in practice, the in‐control state usually has to be estimated. This estimation has a detrimental effect on the performance of control charts, which is often measured by the false alarm probability or the average run length. We suggest an adjustment of the monitoring schemes to overcome these problems. It guarantees, with a certain probability, a conditional performance given the estimated in‐control state. The suggested method is based on bootstrapping the data used to estimate the in‐control state. The method applies to different types of control charts, and also works with charts based on regression models. If a non‐parametric bootstrap is used, the method is robust to model errors. We show large sample properties of the adjustment. The usefulness of our approach is demonstrated through simulation studies.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.