Abstract

The paper deals with the system of parallel flow production lines. Each line can be dynamically divided into partitions designated to concurrent processing different products. The production flow through machines belonging to the partition is synchronized. The set of products which can be manufactured in a given line depends on tools the line is equipped with. Each feasible set of products processed concurrently in the line has been named the preparedness variant. There are many algorithms to control switching the lines between their preparedness variants e.g. priority rules or the Follow-up Scheduling. The quality of current control for the flow production lines strongly depends on previous decision of the preparedness variants configuration. An optimization model for this problem and computational example have been presented in the paper.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.