Abstract

We study a single-machine group scheduling and job-dependent due window assignment problem in which each job is assigned an individual due window based on a common flow allowance. In the group technology environment, the jobs are divided into groups in advance according to their processing similarities and all the jobs of the same group are processed consecutively in order to improve production efficiency. A sequence-independent machine setup time precedes the processing of the first job of each group. A job completed earlier (later) than its due window will incur an earliness (tardiness) penalty. Our goal is to find the optimal sequence for both the groups and jobs, together with the optimal due window assignment, to minimize the total cost that comprises the earliness and tardiness penalties, and the due window starting time and due window size costs. We give an O(nlogn)time algorithm to solve this problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.