Abstract

Aiming at the hard-to-recover damage to the environment caused by material mining and waste slag in the construction of the project, this paper summarizes the green source planning of a large hydropower generation in Tibet, the dam-type development of large-scale hydropower generation with no mining material yard and no permanent waste slag yard in ecologically fragile plateau area achieved for the first time through reasonable planning and utilization of excavation waste slag. The planning protects the environment and Saves engineering investment effectively. The planning which has important social significance and economic value can provide reference for other similar engineering designs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.