Abstract
Controlling molten steel temperature in a tundish is crucial for stable and efficient production of steel products. In this research, a gray-box model is developed by combining a first-principle model and a statistical model. The first-principle model predicts the molten steel temperature in the tundish, and the statistical model predicts the prediction error of the first-principle model. The derived model was then used to derive the molten steel temperature in the Ruhrstahl-Heraeus process at the end of its operation from the target molten steel temperature in the tundish and other process variables. The result of applying the proposed model to real operation data has demonstrated its practicability.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.