Abstract
The construction of arch dams exhibits high uncertainty. Sensitivity analysis of construction parameters is important for the design and optimization of dam construction duration. However, current research cannot fully consider the combined influences of multiple parameters on the total construction. To effectively analyze the duration of arch dam construction, this study proposes a global comprehensive sensitivity analysis method in view of the whole process of arch dam construction based on an orthogonal experiment. This method could comprehensively consider the influence of the construction parameters that may lead to the uncertainty of construction duration. In addition, this method is able to identify the key parameters that may have a significant effect on duration uncertainty and sums up the general rules of combined parameters’ interaction effect, which provides a scientific basis for reasonable optimization of the duration of dam construction.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.