Abstract

There is perhaps no greater challenge to the bridge and structural engineering profession than the proper design and construction of a fixed bridge spanning the Strait of Gibraltar. Previous studies have indicated that a proper bridge for this strait could require span lengths and pier depths far beyond what has been achieved to date. This paper advances the proposition that a suitable solution can be found to meet the requirements of Gibraltar Strait, and to achieve a safe, economical, and environmentally desirable project. It is hoped that this paper has shown that both 5,000-m spans and 450-m deep piers are not only feasible, but also economical.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.