Abstract

Two new breakwaters are being constructed to protect the renewed harbour entrance in Ostend, Belgium. In this paper, both the hydraulic design and geotechnical design are discussed. For the hydraulic design, model tests have been carried out in a 2-D wave flume to optimise the cross section. Stability of the final breakwater, with special attention to the crest element and the armour unit HARO, and stability during the construction phases were tested. The geotechnical design, especially of the north-western breakwater, was an engineering challenge since it is located above a thick layer of very soft soil. A combination of building in stages (consolidation time) and providing a strong reinforcement (geotextile) solved this issue.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.