Abstract

Medium-term generation scheduling is an important component of power systems operation and management. The traditional problem statement aimed at reducing the total production cost can hardly correspond to the market environment. The paper considers specific features of the problem statement for a wholesale electricity market environment. An approach is suggested to solve the problem on the basis of bi-level optimization models. Such models take into account possible distortion of economic and technical parameters of generating units. The proposed technique obtains equilibrium of the generation company’s interests to simulate the competitive behavior under the oligopoly electricity market. A mathematical statement of the problem supposes the application of a dynamic programming method. An algorithm for the stochastic dynamic programming application is developed. A numerical example is presented to demonstrate the applicability of the method and algorithm. The efficiency of the proposed approach is shown in comparison with the traditional generation scheduling technique.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.