Abstract

The process data were hard to obtain in existing scheduling methods for steam power system.A scheduling strategy under uncertainty was proposed to deal with the inaccurate data in steam power system.The inaccurate data was presented by triangular fuzzy number,and a fuzzy scheduling model was established.Then the fuzzy model was shifted to a deterministic mixed integer linear programming(MILP) model by using necessity measures and α-level method.Sensitivity analysis was conducted to identify the effects of the imprecise parameters.An example from a certain petrochemical complex was adopted.Results showed that the power demand was most sensitive in the system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.