Abstract

The 3D modelling of indoor environments and the generation of process simulations play an important role in factory and assembly planning. In brownfield planning cases, existing data are often outdated and incomplete especially for older plants, which were mostly planned in 2D. Thus, current environment models cannot be generated directly on the basis of existing data and a holistic approach on how to build such a factory model in a highly automated fashion is mostly non-existent. Major steps in generating an environment model of a production plant include data collection, data pre-processing and object identification as well as pose estimation. In this work, we elaborate on a methodical modelling approach, which starts with the digitalization of large-scale indoor environments and ends with the generation of a static environment or simulation model. The object identification step is realized using a Bayesian neural network capable of point cloud segmentation. We elaborate on the impact of the uncertainty information estimated by a Bayesian segmentation framework on the accuracy of the generated environment model. The steps of data collection and point cloud segmentation as well as the resulting model accuracy are evaluated on a real-world data set collected at the assembly line of a large-scale automotive production plant. The Bayesian segmentation network clearly surpasses the performance of the frequentist baseline and allows us to considerably increase the accuracy of the model placement in a simulation scene.

Highlights

  • There is no common definition of factory planning

  • We propose an approach to reconstruct an existing industrial production plant including building, product and process related structures based on a 3D point cloud

  • The Bayesian neural network itself is evaluated in our previous work [10]

Read more

Summary

Introduction

There is no common definition of factory planning. A widely used description comes from the Association of German Engineers (VDI), which defines factory planning as “systematic, objective-oriented process for planning a factory, structured into a sequence of phases, each of which is dependent on the preceding phase, and makes use of particular methods and tools, and extending from the setting of objectives to the start of production” [1]. Four major types of factory planning scenarios are distinguished, namely development or greenfield planning, replanning or brownfield planning, dismantling and revitalization.

Methods
Results
Discussion
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.